Tuesday, May 12, 2026
Turn the closeout checklist into a guided “what’s blocking turnover?” assistant that groups missing warranties, O&M manuals, attic stock, training records, and owner approvals by responsible party. It gives PMs a cleaner path from scattered closeout noise to a weekly action list.
ExpansionPanelList with one-tap email/export per subcontractor.After the Certified Delivery Packet work, add a lightweight flag that marks RFIs, submittals, and transmittals touched by a new drawing revision. This catches the common field problem where a revision changes scope but related records stay buried.
drawing_revisions table linked to document IDs, then surface impacted records with a small amber badge and Supabase query on related spec/discipline/location tags.Construction tech is moving away from “paper on glass” toward reducing manual entry. Give DailyReportr+ quick capture chips for weather delay, crew count, equipment idle, material issue, and visitor log so a super can build the report from taps instead of typing.